Refit of the Rachel Douglas


On one of the trips to the Scottish East Coast we hit rough weather crossing the Forth and the cabin suffered much damage a decision was taken to get it re-panelled and while it was being done the engine was lifted out and serviced/replaced.

This entry was posted in Archive, Rachel D. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *